
Construction time锛?2020 Completion time锛?2021 Project area: 205,000??nbsp; Volume of steel锛?3400t
Project description锛?Capacity: 82,000 seats; Retractable roof area: 6,000t; String truss and space frame structure; Intergral lifting: 4,400t weight and 60m height; Work scope: shop drawing, fabrication, erection of steel structure and retractable roof system.
Bright spot锛?Retractable roof stadium